Moodie Implement Wind Turbine

ThinkOne Energy Services has completed the design of this 50kw wind turbine which is scheduled for installation in 2011.  The Endurance wind turbine will sit on a 140 foot lattice frame tower.  ThinkOne Energy Services is responsible for geotechnical investigations and analyses, along with foundation design, electrical design, permitting, and construction.  This project will take advantage of excellent area wind resources and provide Moodie Implement with long term economic power as well as green energy for their facilities.

45 Degrees North